Is your wood deck rotting, sagging or getting soft underfoot? We start by checking the frame, then tell you straight whether it needs a repair, a redeck or a full rebuild. If it's time to replace, we tear it out, haul it away and build you a new TimberTech composite deck on a frame made to outlast the boards. If your frame is still sound, we can save it and redeck it. Most of our composite decks run $65 to $85 a square foot installed.
A few loose boards can be fixed. A failing deck can't, and patching it just spends money on something that's coming down anyway. It's usually time to replace when you see:
Not sure which one you have? That's exactly what our free estimate visit is for. We'll look at the frame, not just the boards, and tell you straight.
We take deck repair calls too. Call (440) 420-4406 and tell us what's going on with your deck. We'll let you know if it's a repair we can take on, or if a redeck or rebuild makes more sense.
Most of the decks we tear out didn't fail at the surface. They failed underneath:
That's why we always check the frame before we talk about boards. Good boards on a bad frame is still a bad deck. If your frame is sound, we'll save it and save you money. If it isn't, we'll tell you straight.
At your free estimate, we inspect the frame under your deck, including posts, beams, joists and footings. That tells us which way to go.
Whenever we can, we save your existing framing. That keeps your cost down.
If the posts, beams, joists or footings are rotted, heaved or built wrong, we tear the whole deck out and build new, from the footings up:
Either way, Brian signs off on the work, and we do a final walkthrough with you. You get our Lifetime Workmanship Warranty in writing.
Since we're building new, the old layout doesn't limit you. Homeowners often use a replacement to:
Most of our composite deck replacements run $65 to $85 a square foot installed, materials and labor included, depending on the materials, the complexity of the deck and other factors, with tear-out as part of the job. A 300 square foot deck comes in around $19,500 to $25,500. Height, stairs, railing, levels and advanced PVC move the price up or down. A redeck usually costs less than a full rebuild because your existing frame stays.
Ask about our financing options through Hearth. Checking your options doesn't affect your credit score.
Send it to us before you sign. We'll walk you through what's under the boards: how deep the footings go, what size posts, what framing lumber and how the deck attaches. Then you can compare quotes on more than price and board brand.
If the rot or movement is in the posts, beams or joists, or the deck sags, sinks or pulls away from the house, it's usually time to replace. Loose boards, a wobbly railing or a damaged step can often be repaired. We'll check the frame and tell you straight.
Most of our composite deck replacements run $65 to $85 a square foot installed, including tear-out. A 300 square foot deck is around $19,500 to $25,500.
Yes, when the frame is sound. We inspect it first. Whenever we can, we save the framing and put joist tape on top of every joist to protect it before the new boards go on. If the frame is rotted, heaved or built wrong, we'll recommend a full rebuild and explain why.
Yes. Tear-out and haul-away are part of the job.
Yes. Call (440) 420-4406 and tell us what's going on. We'll let you know if it's a repair we can take on, or if a redeck or full rebuild makes more sense.
Our Lifetime Workmanship Warranty, for as long as you own your home, plus TimberTech's warranty on the boards. On a redeck, the warranty covers the work we do, not the original framing we kept.
Book a free estimate visit. We'll look at the frame, tell you straight whether it's time to replace, and give you a clear price.
Copyrights 2026 Master Deck Builder Cleveland | Privacy Policy | Terms of Service | Warranty